CETU Building 4th Floor P.O.Box41311 Addis Ababa, Ethiopia


Narrative Description of Project: The Ethiopian Roads Authority (ERA) on behalf of FDRE has allocated funds for the construction works of Melka Jebdu – Diredawa Industrial Park Design and Build Road Project and signed an Agreement with China Civil Engineering and Construction Corporation. Accordingly TACT Engineering Group is assigned as the consultant to undertake the detail design of all bridges and other highway structures for the Design and Build road project which is a 7.5km. The road and the bridges has a 3 lane vehicular carriage way one way with a 2m bycycle lane and 3m wide pedestrian lane separated from the main road by a median
DURATION September 2017 to November 2018.
NAME OF PROJECT CLIENT Roads Authority ETHIOPIA
COUNTRY OF ASSIGNMENT Ethiopian
Role on the Assignment Ethio Infra Engineering PLC China Civil Engineering and Construction Corporation
Dire Dawa-Melkajebdu Industrial Park Access Road Project Design and Build Road Project (83 km